Opportunities & Constraints Plans

Download the Opportunities & Constraints Plan, part of the redevelopment planning study for the East Helena Smelter.  This is a two part document, with both links below. O&C Plan (Part 1) (7.69MB PDF) O&C Plan (Part 2) (7.37MB PDF)

 

Resource Conservation and Redevelopment Act (RCRA) Overview

Download a presentation overviewing RCRA corrective action and how it pertains to the East Helena site. Introduction to RCRA (801KB PDF)

 

Montana Settlement Agreement

Download the Montana Settlement Agreement PDF

 

Consent Decree

Download the Consent Decree (PDF)

 

East Helena Public Meeting and Open House

Download the Slides from the January 18, 2012 Public Meeting and Open House (11MB PDF) Download the Proposed Interim Measure for: South Plant Hydraulic Control, East Helena, Montana (7MB PDF)

 

Final Baseline Ecological Risk Assessment: Former ASARCO East Helena Facility

Download the Baseline Ecological Risk Assessment (BERA) for the East Helena Site. (59MB PDF)

 

Prickly Pear Creek (PPC) Fact Sheet

February 2, 2012 Download the PDF Fact Sheet containing information about: Background Existing Water Control Structures What is the Upper Lake (UL) Aquifer Test? Prickly Pear Creek (PPC) Studies Cleanup Activities and Interim Measures Current Concerns About Prickly Pear Creek (PPC) How … Continue reading

 

Request For Proposals for Redevelopment Plans & Studies

Notice: Please be advised that the deadline for submission of responses to the Request for Proposals for Redevelopment Plans & Studies, East Helena, MT has been extended to July 11 at 5:00 pm Mountain Time. Responses should be submitted electronically … Continue reading

 

Announcing CH2M HILL as Environmental Engineering Consultant in East Helena

METG is pleased to announce the selection of CH2M HILL as the environmental engineering consultant for the RCRA Corrective Action project at the former Asarco smelter in East Helena, Montana. CH2M HILL has teamed with Morrison-Maierlie Engineering (Helena) , Pioneer … Continue reading

 

Feb 24th, 2011 Annual Meeting Presentation

View the 32 slide presentation from Montana Environmental Trust Group’s Annual Meeting on Feb 24th, 2011. (3.9MB PDF)

 