These flyover drone photos show active progress at the East Helena Site and former ASARCO facility throughout 2014. Since 2012, the Custodial Trust has been working on designing and construction interim measures (IMs), including lowering groundwater at the south end of the former facility and creating an evapotranspirative (ET) cover system to eliminate exposure to contaminated soils.