2017 Groundwater and Surface Water Corrective Action Monitoring Plan

2017 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, prepared July 2017. Download the PDF here.

East Helena Slag Pile Cover Concepts Technical Memo, December 2016

Now available:

Technical Memorandum, Slag Pile Cover Concepts for the East Helena Former ASARCO Smelter Site. Prepared December 2016. This Memo provides an update to the September 2016 Slag Pile Cover Concepts, with a recommended cover concept for the slag pile at the Site.

Download the PDF here.

Fact Sheet: East Helena Cleanup—A Model of Environmental Protection and Sustainability

This Fact Sheet was prepared by the U.S. Environmental Protection Agency (EPA) and the Montana Environmental Trust Group, LLC, Trustee of the Montana Environmental Custodial Trust. It covers the environmental challenge of the former ASARCO Smelter in East Helena, the cleanup solution, the results, and what comes next.

Download this 9.48 MB PDF

Technical Memo – Existing Information and Data Compilation for Slag Pile Area

Technical Memorandum – Existing Information and Data Compilation for the Former East Helena Smelter Slag Pile Area, May 2016. Download the PDF here.

2016 Groundwater and Surface Water Corrective Action Monitoring Plan

2016 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, prepared April 2016. Download the PDF here.

Final Corrective Measures Study Work Plan

Now Available:
October 22, 2015 Former ASARCO East Helena Facility Final Corrective Measures Study Work Plan

Download this file as a 50MB PDF

Final Addendum to Interim Measures Work Plan—2015 and 2016

Now Available:
March 23, 2016 Former ASARCO East Helena Facility Final Addendum to Interim Measures Work Plan—2015 and 2016

Download this file as a 8.4MB PDF

2015 Supplemental Contaminant Source Area Investigation Report

2015 Supplemental Contaminant Source Area Investigation at the Former East Helena Smelter Site. Prepared March 2016.

Download the PDF here.

Update on Corrective Measures Studies Activities

Now Available:
March 3, 2016 Technical Memo – Former ASARCO East Helena Facility Update on Corrective Measures Studies Activities

Download this file as a 12MB PDF

Draft Addendum to Interim Measures Work Plan—2015 and 2016

Now Available:
January 14, 2016 Former ASARCO East Helena Facility Draft Addendum to Interim Measures Work Plan—2015 and 2016

Download this file as a 12.5MB PDF