2021 Corrective Action Monitoring Plan
Now Available:
2021 Groundwater and Surface Water Corrective Action Monitoring Plan for the East Helena Facility, Prepared June 2021.
Now Available:
2021 Groundwater and Surface Water Corrective Action Monitoring Plan for the East Helena Facility, Prepared June 2021.
The Corrective Measures Study (CMS) Report, prepared by the Montana Environmental Trust Group, LLC (METG), Trustee of the Montana Environmental Custodial Trust, consists of an 88-page document followed by 6 appendices, 149 figures and 42 tables. Due to the size of the CMS Report, it has been uploaded to the METG website in the following ten (10) separate links or installments. Please note that it may take a few minutes to access the larger files.
EPA has issued the CMS Report for public review and comment. There will be a public meeting on Wednesday, April 11th from 6:30 to 8:30 pm at the Custodial Trust’s offices in East Helena (325 Manlove Street, East Helena) to review the CMS Report.
For more invitation, please see the Notice and Invitation
Now available:
Technical Memorandum, Slag Pile Cover Concepts for the East Helena Former ASARCO Smelter Site. Prepared December 2016. This Memo provides an update to the September 2016 Slag Pile Cover Concepts, with a recommended cover concept for the slag pile at the Site.
Download the PDF Fact Sheet containing information about: