Technical Memo – Existing Information and Data Compilation for Slag Pile Area
Technical Memorandum – Existing Information and Data Compilation for the Former East Helena Smelter Slag Pile Area, May 2016. Download the PDF here.
Technical Memorandum – Existing Information and Data Compilation for the Former East Helena Smelter Slag Pile Area, May 2016. Download the PDF here.
2016 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, prepared April 2016. Download the PDF here.
Now Available:
October 22, 2015 Former ASARCO East Helena Facility Final Corrective Measures Study Work Plan
Now Available:
March 23, 2016 Former ASARCO East Helena Facility Final Addendum to Interim Measures Work Plan—2015 and 2016
2015 Supplemental Contaminant Source Area Investigation at the Former East Helena Smelter Site. Prepared March 2016.
Now Available:
March 3, 2016 Technical Memo – Former ASARCO East Helena Facility Update on Corrective Measures Studies Activities
Now Available:
January 14, 2016 Former ASARCO East Helena Facility Draft Addendum to Interim Measures Work Plan—2015 and 2016
Now Available:
May 29, 2015 Former ASARCO East Helena Facility Draft Interim Measures Work Plan—2015 and 2016
2015 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, prepared March 2015. Download the PDF here.
2014 Supplemental Contaminant Source Area Investigation Report for the Former East Helena Smelter Site. Prepared February 2015.