2020 Corrective Measures Study (CMS) Report Addendum

Now Available: Corrective Measures Study (CMS) Report Addendum for the East Helena Facility, prepared October 2020. This addendum finalizes the 2018 draft CMS report, linked here.  Download the addendum here.

2019 East Helena Water Resources Monitoring Report

Now Available: 2019 East Helena Water Resources Monitoring Report, East Helena Facility, Prepared August 2020. Download this PDF (13 MB)

2018 East Helena Groundwater Monitoring Report

Now Available:
2018 East Helena Groundwater Monitoring Report, East Helena Facility, Prepared December 2019

Download this PDF (8 MB)

2017 East Helena Groundwater Monitoring Report

Now Available:
2017 East Helena Groundwater Monitoring Report, East Helena Facility, Prepared December 2018

Download this PDF (25 MB)

2015-2016 East Helena Groundwater Monitoring Report

Now Available:
2015-2016 East Helena Groundwater Monitoring Report, East Helena Facility, Prepared December 2017

Download this PDF (25 MB)

2019 Groundwater and Surface Water Corrective Action Monitoring Plan

Now Available: 2019 Groundwater and Surface Water Corrective Action Monitoring Plan for the East Helena Facility, Prepared May 2019. Download this PDF.

2018 Corrective Action Monitoring Plan

Now available:

2018 Groundwater and Surface Water Corrective Action Monitoring Plan for the East Helena Facility, Prepared June 2018

Download this PDF here.

 

Available for Public Review and Comment: Draft Former Asarco East Helena Facility Corrective Measures Study (CMS) Report

The Corrective Measures Study (CMS) Report, prepared by the Montana Environmental Trust Group, LLC (METG), Trustee of the Montana Environmental Custodial Trust, consists of an 88-page document followed by 6 appendices, 149 figures and 42 tables.  Due to the size of the CMS Report, it has been uploaded to the METG website in the following ten (10) separate links or installments.  Please note that it may take a few minutes to access the larger files.

  1. CMS Report
  2. Appendix A—Summary of Groundwater Modeling Supporting Corrective Measures Study
  3. Appendix B—Tier II Source Control Measure/Groundwater Remedy Evaluation—Phase 2 Results and Recommendations
  4. Appendix C—Summary of Soil Removal Alternatives Evaluation and Mining Visualization System Model Development
  5. Appendix D—Summary of Supplemental RFI Soil Sampling Results for Undeveloped Lands
  6. Appendix E—Human Health and Ecological Risk Assessment
  7. Appendix F—Slag Pile Cover Concepts Technical Memorandum
  8. Appendix G—Lead Education and Abatement Program Administrative Boundary
  9. Tables referenced in the CMS Report
  10. Figures referenced in the CMS Report

EPA has issued the CMS Report for public review and comment.  There will be a public meeting on Wednesday, April 11th from 6:30 to 8:30 pm at the Custodial Trust’s offices in East Helena (325 Manlove Street, East Helena) to review the CMS Report.

For more invitation, please see the Notice and Invitation

2017 Groundwater and Surface Water Corrective Action Monitoring Plan

2017 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, prepared July 2017. Download the PDF here.

East Helena Slag Pile Cover Concepts Technical Memo, December 2016

Now available:

Technical Memorandum, Slag Pile Cover Concepts for the East Helena Former ASARCO Smelter Site. Prepared December 2016. This Memo provides an update to the September 2016 Slag Pile Cover Concepts, with a recommended cover concept for the slag pile at the Site.

Download the PDF here.