2021 East Helena Corrective Measures Implementation Work Plan, Aug 2021
Now Available: Corrective Measures Implementation (CMI) Work Plan for the East Helena Facility, finalized August 2021. Download the PDF here.
Now Available: Corrective Measures Implementation (CMI) Work Plan for the East Helena Facility, finalized August 2021. Download the PDF here.
Unfumed Slag Processing and Removal – Groundwater Monitoring Plan for the East Helena Former Smelter Facility. Prepared August 2021.
Now Available: 2021 Groundwater and Surface Water Corrective Action Monitoring Plan for the East Helena Facility, Prepared June 2021. Download the PDF here.
Now available: 2020 Water Resources Monitoring Report for the East Helena Facility. Prepared June 2021. Download the PDF here.
Now Available: Corrective Measures Study (CMS) Report Addendum for the East Helena Facility, prepared October 2020. This addendum finalizes the 2018 draft CMS report, linked here. Download the addendum here.
The Statement of Basis for Groundwater, Surface Water and Soil Corrective Measures (Remedy) Decision at the former ASARCO East Helena Facility and Response to Comments, July 2020, is available here.
Statement of Basis Final Combined for GW, SW, and Soil CMs (Remedy) Decision July 2020
Now Available: 2020 Groundwater and Surface Water Corrective Action Monitoring Plan for the East Helena Facility, Prepared May 2020. Download this PDF
Now Available: 2019 East Helena Water Resources Monitoring Report, East Helena Facility, Prepared August 2020. Download this PDF (13 MB)
Now Available: 2019 Groundwater and Surface Water Corrective Action Monitoring Plan for the East Helena Facility, Prepared May 2019. Download this PDF.
Now Available:
2018 East Helena Groundwater Monitoring Report, East Helena Facility, Prepared December 2019