2018 Corrective Action Monitoring Plan, June 2018
Now available:
2018 Groundwater and Surface Water Corrective Action Monitoring Plan for the East Helena Facility, Prepared June 2018
Now available:
2018 Groundwater and Surface Water Corrective Action Monitoring Plan for the East Helena Facility, Prepared June 2018
The Corrective Measures Study (CMS) Report, prepared by the Montana Environmental Trust Group, LLC (METG), Trustee of the Montana Environmental Custodial Trust, consists of an 88-page document followed by 6 appendices, 149 figures and 42 tables. Due to the size of the CMS Report, it has been uploaded to the METG website in the following ten (10) separate links or installments. Please note that it may take a few minutes to access the larger files.
EPA has issued the CMS Report for public review and comment. There will be a public meeting on Wednesday, April 11th from 6:30 to 8:30 pm at the Custodial Trust’s offices in East Helena (325 Manlove Street, East Helena) to review the CMS Report.
For more invitation, please see the Notice and Invitation
Now Available:
2017 East Helena Groundwater Monitoring Report, East Helena Facility, Prepared December 2018
2017 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, prepared July 2017. Download the PDF here.
Now Available:
2015-2016 East Helena Groundwater Monitoring Report, East Helena Facility, Prepared December 2017
Now available:
Technical Memorandum, Slag Pile Cover Concepts for the East Helena Former ASARCO Smelter Site. Prepared December 2016. This Memo provides an update to the September 2016 Slag Pile Cover Concepts, with a recommended cover concept for the slag pile at the Site.
Technical Memorandum – Existing Information and Data Compilation for the Former East Helena Smelter Slag Pile Area, May 2016. Download the PDF here.
2016 Groundwater and Surface Water Corrective Action Monitoring Plan for the former ASARCO East Helena Facility, prepared April 2016. Download the PDF here.
Now Available:
March 23, 2016 Former ASARCO East Helena Facility Final Addendum to Interim Measures Work Plan—2015 and 2016
2015 Supplemental Contaminant Source Area Investigation at the Former East Helena Smelter Site. Prepared March 2016.